Section through Warehouse
Temporary Propping and Safety Rail
Precast panel starter bars
This image shows where the joint will occur between the panel and the slab. The starter bars are bent for delivery and the rough surface will allow the newly poured concrete to bond to create a rigid connection.
Double Story Construction
This is a section through a typical double story office block, It consists of a suspended slab upper floor supported by secondary beams. The curtain wall consists of a brick veneer. The roofing system consists of UB rafters 'C' channel purlins and a iron roof. The section also shows a suspended ceiling system.
Thursday, April 10, 2008
Pre Cast and Tilt Up End Wall Detail
Tuesday, April 8, 2008
Wednesday, March 19, 2008
Thursday, March 13, 2008
Tuesday, March 11, 2008
3m X3m View of intersecting trusses
Wednesday, March 5, 2008