skip to main | skip to sidebar

construction & Structures

Thursday, May 1, 2008

Design Developments for the Warehouse


Basic design for the warehouse using a similar structural system to that of the Renault center
Posted by Damjan at 4:35 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (25)
    • ►  June (6)
    • ▼  May (9)
      • Details of Structural Devices
      • Section through Warehouse
      • Design Developments for the Warehouse
      • Inspiration for Project 1
      • Temporary Propping and Safety Rail
      • 'Condek' Shuttering
      • Precast panel starter bars
      • Precast Panel Delivery
      • Double Story Construction
    • ►  April (2)
    • ►  March (8)

About Me

Damjan
View my complete profile